livefaith
Well-Known Member
- Joined
- Sep 2, 2007
- Messages
- 17,653
- Likes
- 19,786
So they are filling in current bowl to allow for a crown on the field. But, I am not seeing where any water is going to drain. One would assume current outlet is at the bottom of the bowl.
I guess there must be drains along the "sides" of the bowl that will handle it?
Anyone got the blueprints?
Thats gonna be a nice time lapse video. Such a big scale undertaking.(twss) Watching history in the making Vol fans!
Imagine: A sweet time lapse video along with an epic tailgate/camping party. A big time pregame show and festivities. Tensions mount as fans from both sides go crazy and millions tune in for the largest crowd ever to witness a football game. As it builds and builds until....moments after opening kickoff VT gets knocked the **** out, takes its ball and goes home whimpering.
Yep, worth every penny IMO.
So they are filling in current bowl to allow for a crown on the field. But, I am not seeing where any water is going to drain. One would assume current outlet is at the bottom of the bowl.
I guess there must be drains along the "sides" of the bowl that will handle it?
Anyone got the blueprints?
I would think, since BMS is NOT becoming a permanent football venue, that they would not need a permanent drainage system for that. Perhaps they might need it more for, and have some sort of drainage in place for the track infield? If they need it, they may use some sort of temporary pumps.
I am sure Bruton has engineers who figured out what they needed a long time ago. So, I doubt all attending need to bring a plastic bucket just in case.