We kewl?

For instance I get with a developer and get his design of a development that he is building I take it and get with the power company work out a plan with them for a shared trench or not draft it out in CAD. From there I engineer the best and least cost effective way to get service in the subdivision or apartment or business then I design it over my draft and plan out the terminals grounding and hand holes. Add up the price send the bill and the job to the company and construction builds off my design and engineering and I make sure all is well. There is alot of different jobs also I have designed half a million dollar c.o's that go on easements and regenerate the fiber so it can run another 70kf and I design cabinets and cell towers and small stuff like replace a pole when hit by a car or road moves I have also designed and priced over builds for a city and that is the worst having to draw all the roads and figure that out. But whatever I due when I am told to do it it is due bye a certain time or it's a fine each day late.
 
Lulz. We sure do swing and miss a lot in the Zone. We’d be an awful baseball team
Ooorrrr, there's a bunch of liars in the Zone. I mean, do you really believe TFG drinks beer instead of Zima and is married...to a woman? You really believe souce is building a house and not adding on to his mom's basement? You really believe I'm 26? Do you ....I'll stop there.
 

Advertisement



Back
Top