So we’re putting the electrical in the ground at the property. I’m paying for it so we don’t have power poles. We have to be in the ground 40 inches. At 32 inches we found granite. I **** you not.....granite. Sand stone I can deal with. But ****ing granite?!?
Now we get to start the process of waivers. Some places allow 2 inches of concrete over the electrical conduit for every 6 inches above 36 inches deep. That would mean 4 inches of concrete over the conduit.
Hopefully Sequachiee county will agree