We dug a pit and filled it with gravel. Trenched fromthe problem area to the pit. Put a piece of pipe covered with a "sock" and ran it to the pit. Then we covered it with gravel and then filled it all back in with dirt. Only cost me 400.00. That included the leveling for the pool, some clearing and scraping, seed, fertilizer, and straw.
If you did that, then you can do your fill lines. Do the 8in pipe. Stay away from the old black 6in pipe. I also am not a fan of the infeltrater system.
If you did that, then you can do your fill lines. Do the 8in pipe. Stay away from the old black 6in pipe. I also am not a fan of the infeltrater system.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.