Went back this morning to take a closer look at that barn in better lighting.
My old buddy Mr Powder Post Beetle had been busy at work in this sucker.
Because of the open ends in this barn and the hay loft door, it has allowed rain to blow into the barn and keep moisture in the wood. That's all those suckers need.
Basically everything down stairs is bad. The 1x boards on the side may be good, maybe not. They have siding over them on the outside. They look ok from the inside but you can never know for sure.
The pic I took down the center aisle of the barn, all the 2x6 and 2x10 floor joists you see are bad. Every single one.
All the downstairs oak beams are bad.
In the loft.. Some of the floor is ok.. the beams that are near the ceiling are ok. The 2x6 roof joists look good but you can't always tell until you get the roof off. Sometimes the tin roofs leak around the nails and rot, but it doesn't show on the outside. With that being said there are about 40 down each side so there are bound to be some good ones.
So it looks like I could get the tin, and what's good from the 1x siding, the beams in the loft, flooring and roof joists from the loft. That's about it. The rest would get pushed down and burned.
So it went from 15000 board feet to maybe 4000 lol.
I was so disappointed. It looked great last night but that's why you always look them over good before you decide or give an answer. And look at it hard. I could have committed to something that would have tied me up for 2 months and gotten a fraction of what I could be earning.
I'm gonna offer to take what I can, burn the rest, and him be responsible for the foundstion.
Hopefully around 2 weeks worth if work, take my 4000 board feet and move on.
He wants to talk on Monday so we will see.