Construction by the stadium

#1

jlindsa4

Well-Known Member
Joined
Aug 21, 2010
Messages
2,234
Likes
1,097
#1
Just wanted to post some pics by the stadium to show some of the new renovations. They are minor but they are still fun to look at.

1896910_10102383148403385_7036415050409361425_n.jpg


This is the new pedestrian bridge. Underneath you can see the renovations of the lot 9 parking lot. You can see they now added plants in between parking spaces. Also there is a big brick wall that lines the lot. This will be interesting getting to the stadium. A lot of people used to just walk through the lot. Now they have a giant wall to climb over.

10463995_10102383148433325_1878895425800033013_n.jpg


This is the new student union that is connected to the old student union (the UC). It wont be complete by the time games start, but it should have brick covering the majority of the building by the first game.
 
#3
#3
Im assuming all the work will be gone before the first game. But they may have it there anyway because they usually have phil fulmer way closed off.
 
#4
#4
Just making sure I've got my coordinates down...is that the same bridge location as the old bridge? And the building to the right is where the old money wall was?
 
#5
#5
Just making sure I've got my coordinates down...is that the same bridge location as the old bridge? And the building to the right is where the old money wall was?

That is the old money wall on the right where the side entrance to the bookstore used to be.

I don't remember a pedestrian bridge being there before.
 
#8
#8
Love the lettering on the bridge!

That brick wall is going to make the Vol Walk interesting.
 
#10
#10
That is the old money wall on the right where the side entrance to the bookstore used to be.

I don't remember a pedestrian bridge being there before.

It hasn't been gone long (enter someone saying, "It's been gone 10 years", making me feel like a geezer.).
 

VN Store



Back
Top